Dodge Journey: Cooler, EGR
Description

Fig. 62: EGR COOLER
- - EGR COOLER TO EGR VALVE TUBE
- - MOUNTING SCREWS
- - EGR COOLER MOUNTING SCREW
- - MOUNTING SCREW
- - EGR COOLER BODY
- - EGR COOLER MOUNTING NUT
- - EGR COOLER
- - INLET TUBES
- - VACUUM CONTROL UNIT
- - EGR COOLER TO EXHAUST MANIFOLD TUBE MOUNTING NUT
- - EGR COOLER TO EXHAUST MANIFOLD TUBE
- - MOUNTING SCREW
The EGR cooler (7) cools recirculated exhaust gasses to reduce combustion temperature and a greater mass of exhaust gases can thus be circulated. There is less nitrogen oxides as a result.
The EGR cooler (7) allows the engine and catalytic converter to reach their operating temperature quickly.
Removal

Fig. 63: EGR COOLER
- - EGR COOLER TO EGR VALVE TUBE
- - MOUNTING SCREWS
- - EGR COOLER MOUNTING SCREW
- - MOUNTING SCREW
- - EGR COOLER BODY
- - EGR COOLER MOUNTING NUT
- - EGR COOLER
- - INLET TUBES
- - VACUUM CONTROL UNIT
- - EGR COOLER TO EXHAUST MANIFOLD TUBE MOUNTING NUT
- - EGR COOLER TO EXHAUST MANIFOLD TUBE
- - MOUNTING SCREW
1. Remove engine cover.
2. Drain cooling system.
3. Remove EGR cooler coolant hoses (8).
4. Remove EGR cooler to exhaust manifold tube (11).
5. Remove EGR cooler to EGR valve tube (1).
6. Remove EGR cooler mounting nuts (6).
7. Remove EGR cooler (7).
8. Remove the bypass valve mounting screws (3).
9. Separate the bypass valve assembly from the EGR cooler body (5).
Installation

Fig. 64: EGR COOLER
- - EGR COOLER TO EGR VALVE TUBE
- - MOUNTING SCREWS
- - EGR COOLER MOUNTING SCREW
- - MOUNTING SCREW
- - EGR COOLER BODY
- - EGR COOLER MOUNTING NUT
- - EGR COOLER
- - INLET TUBES
- - VACUUM CONTROL UNIT
- - EGR COOLER TO EXHAUST MANIFOLD TUBE MOUNTING NUT
- - EGR COOLER TO EXHAUST MANIFOLD TUBE
- - MOUNTING SCREW
1. Using a new gasket, position the bypass valve assembly to the EGR cooler body (5). Tighten screws to 10 N.m (88 in. lbs.).
2. Position EGR cooler (7) and install mounting screws. Tighten to 10 N.m (88 in. lbs.).
3. Install EGR cooler to exhaust manifold tube (11). Tighten bolts to 20 N.m (14 ft. lbs.) and nuts to 20 N.m (14 ft. lbs.).
4. Install EGR cooler to EGR valve tube (1). Tighten bolts to 20 N.m (14 ft. lbs.).
5. Install coolant hoses.
6. Install vacuum line.
7. Fill cooling system.
8. Install engine cover.
Coolant
Description
ENGINE COOLANT
GAS ENGINES
WARNING: Antifreeze is an ethylene glycol based coolant and is
harmful if swallowed
or inhaled. If swallowed, drink two glasses of water and ind ...
Draincock, radiator
Removal
DRAINCOCK
Fig. 65: DRAINCOCK & RADIATOR TANK
CAUTION: Use of pliers on draincock is not recommended. Damage may
occur to
radiator or draincock.
NOTE: It is no ...
See also:
Motor, headlamp leveling, export
DESCRIPTION
Fig. 37: Headlamp Leveling Motor
The headlamp leveling motor (1) is located on the rear surface of each front
lamp unit on vehicles equipped
with the headlamp leveling system, which ...
Manifold, exhaust, rear
Removal
Fig. 305: Belly Pan
- belly pan fasteners
- belly pan
1. Remove the belly pan (2).
Fig. 306: Oxygen Sensors
2. Remove the oxygen sensors (2) and (4).
Fig. 307: Exhaust Gas R ...
Removal
WARNING: Review safety precautions and warnings in this part
before performing
this procedure. See Heating and Air Conditioning/Plumbing - Warning
and. Failure to
follow the warnin ...
