Dodge Journey: MAINTENANCE SCHEDULES

EMISSIONS CONTROL SYSTEM MAINTENANCE
The Scheduled Maintenance services listed in bold type, must be done at the times or mileages specified to ensure the continued proper functioning of the Emissions Control System. These, and all ot ...

See also:

Installation
Fig. 67: Seal Protector - HALFSHAFT - SEAL PROTECTOR 1. Install driveline module to transmission jack. Secure module to jack. 2. Using Seal Protector 9099 (2), load halfshafts to differe ...

Assembly
Fig. 239: Output Shaft #2 & Needle Bearing 1. Install the reverse needle bearing (1) onto the output shaft # 2 (2). Fig. 240: Synchronizer NOTE: Pay attention to the direction when inser ...

Standard procedure
ENGINE GASKET SURFACE PREPARATION Fig. 4: PROPER TOOL USAGE FOR SURFACE PREPARATION To ensure engine gasket sealing, proper surface preparation must be performed, especially with the use of alu ...

0.0147