Dodge Journey: Battery System

Description, Operation
DESCRIPTION Fig. 1: Battery Components This vehicle is equipped with a single 12-volt battery. All of the components of the battery system are located in the front of the vehicle, just ahead of ...

See also:

Installation
LEFT-HAND-DRIVE NOTE: The master cylinder must be bled before installing it on the vehicle. 1. Bench bleed the master cylinder. 2. Wipe the face of the power brake booster clean where the ...

Description, Operation
DESCRIPTION Fig. 430: Identifying Valve Body Assembly - VALVE BODY - T/C REGULATOR VALVE - L/R SWITCH VALVE - CONVERTER CLUTCH CONTROL VALVE - MANUAL VALVE - CONVERTER CLUTCH SWITCH V ...

Disassembly
Fig. 314: Removing/Installing Differential Cover Bolts - DIFFERENTIAL COVER BOLTS - DIFFERENTIAL COVER NOTE: The transfer shaft should be removed for differential repair and bearing t ...

0.0145