Dodge Journey: Motor, blower, front

Installation
HOUSING-AIR DISTRIBUTION NOTE: LHD model shown in illustrations. RHD model similar. Fig. 131: Air Distribution Housing-Removal/Installation 1. Position the air distribution housing (2) onto ...

Description, Operation
DESCRIPTION Fig. 139: Blower Motor-PM The blower motor (1) is used to control the velocity of air moving through the HVAC housing by spinning the blower wheel (2) within the HVAC air inlet hous ...

See also:

ENGINE BREAK-IN RECOMMENDATIONS
A long break-in period is not required for the engine and drivetrain (transmission and axle) in your vehicle. Drive moderately during the first 300 mi (500 km). After the initial 60 mi (100 km), sp ...

Sensor, evaporator temperature
DESCRIPTION Fig. 34: Evaporator Temperature Sensor-Description The evaporator temperature sensor measures the temperature of the conditioned air downstream of the A/C evaporator. The evaporator ...

Installation
Fig. 28: Sealing Boot Installation on Interconnecting Shaft - SEALING BOOT - RAISED BEAD IN THIS AREA OF SEALING BOOT - GROOVE - INTERCONNECTING SHAFT 1. Slide new sealing boot clamp (2 ...

0.0148