Dodge Journey: Cover(s), engine timing

Removal

2.7L DOHC Engine
Fig. 349: FRONT SPLASH SHIELDS

1. Disconnect and isolate negative battery cable.

2. Drain cooling system.

3. Remove coolant pressure container.

4. Remove right front wheel and belt splash shield (2).

2.7L DOHC Engine
Fig. 350: Accessory Drive Belt System - 2.7L

  1. - GENERATOR
  2. - IDLER/TENSIONER

5. Remove accessory drive belts (2).

6. Remove crankshaft vibration damper.

7. Remove AC/Generator belt tensioner/bracket assembly.

8. Disconnect heater hose from tube at right front frame rail area.

9. Remove screws securing heater supply tube to right frame rail. Reposition heater supply tube.

2.7L DOHC Engine
Fig. 351: TIMING CHAIN COVER

10. Place a floor jack with wooden block under oil pan to support engine.

11. Remove right engine mount.

12. Remove upper timing chain cover bolts.

13. Remove remaining bolts securing timing chain cover to engine.

14. Remove timing chain cover (2).

15. Discard timing chain cover gasket (1). Remove front crankshaft oil seal from cover.

Installation

2.7L DOHC Engine
Fig. 352: TIMING CHAIN COVER

1. Inspect and clean timing chain cover sealing surfaces.

2. Before installing timing cover gasket apply a 1/8 inch bead of Mopar Engine RTV GEN II to the parting lines between the oil pan and cylinder block.

3. Install timing cover (2) and gasket (1). Tighten M10 cover bolts to 54 N.m (40 ft. lbs.) and M6 bolts to 12 N.m (105 in. lbs.).

4. Install front crankshaft oil seal using Special Tool 6780-2 sleeve and 6780-1 installer.

5. Lower vehicle.

2.7L DOHC Engine
Fig. 353: Accessory Drive Belt System - 2.7L

6. Install right engine mount.

7. Install screws attaching heater supply tube to right front frame rail area.

8. Raise vehicle on hoist.

9. Connect heater hose to supply tube at right front frame rail area.

10. Install AC/Generator belt tensioner/bracket assembly.

11. Install crankshaft vibration damper.

12. Install accessory drive belts (2).

2.7L DOHC Engine
Fig. 354: Removing/Installing Front Splash Shields

13. Install belt splash shield and right front wheel.

14. Lower vehicle.

15. Install coolant pressure container.

16. Fill cooling system.

17. Connect negative battery cable.

    Chain and sprockets, timing
    Removal TIMING CHAIN AND CAM SPROCKETS Fig. 334: TIMING MARK ALIGNMENT - CAMSHAFT TIMING MARKS - CRANKSHAFT TIMING MARKS 1. Disconnect negative battery cable. 2. Drain cooling system. ...

    Cooling
    ...

    See also:

    Description
    Fig. 253: Upper Suction/Liquid Line Assembly NOTE: A/C Suction line for 2.7L engine shown. Other engines similar. The A/C suction line carries refrigerant from the A/C expansion valve to the ...

    Description
    The instrument cluster contains the necessary hardware and software to serve as the vehicle electronic body control module and is commonly referred to as the Cab Compartment Node (CCN). The CCN u ...

    Diagnosis and Testing
    BASE BRAKE SYSTEM NOTE: There are three diagnosis charts following that cover the RED BRAKE WARNING INDICATOR LAMP, BRAKE NOISE and OTHER BRAKE CONDITIONS. RED BRAKE WARNING INDICATOR LAMP ...

    0.0093