Dodge Journey: Drier, A/C receiver
Dodge Journey Service & Repair Manual / Heating & Air Conditioning / Plumbing, front / Drier, A/C receiver
Core, service port valve
DESCRIPTION
Refrigerant system service ports are used to recover, recycle, evacuate,
charge and test the A/C refrigerant
system. Unique sizes are used on the two service ports for the R-134a
ref ...
Description, Operation
DESCRIPTION
Fig. 231: Receiver/Drier Description
The A/C receiver/drier (1) stores unused refrigerant, filters the
refrigerant, helps remove moisture from the
refrigerant and retains any refrig ...
See also:
Assembly
Fig. 97: Installing Output Bearing Cups
- OUTPUT BEARING CUPS
- WRENCHES
- INSTALLER - 5050A
CAUTION: The cooler bypass valve must be replaced if transaxle
failure has
occur ...
Assembly
Fig. 214: First Gear Needle Bearing & Output Shaft
NOTE: Use ATF on all parts that are to be assembled in this procedure.
1. Install the first and first gear needle bearing (2) on the out ...
Description, Operation
DESCRIPTION
Fig. 29: Removing/Installing ECM - 2.0L Diesel
The ECM (3) is located in the left side of engine compartment attached to the
left inner fender below the air
filter housing.
OPERAT ...
