Dodge Journey: Capacitor, ignition

Description, Operation, Specifications
DESCRIPTION NOTE: All engines use a fixed ignition timing system. Basic ignition timing is not adjustable. All spark advance is determined by the Powertrain Control Module (PCM). The ign ...

Removal
2.4L Fig. 3: Capacitor 2.4L - Bolt - Capacitor - Connector 1. Disconnect and isolate negative battery cable at battery. 2. Remove engine cover. 3. Remove electrical connector (3). ...

See also:

Installation
2.7L ENGINE Fig. 32: Maniverter To Cross Under Fasteners 1. Install the cross under pipe (3). and the front maniverter-to-cross under fasteners (1) and (2). Tighten to 27 Nm (20 ft. lb.). Fi ...

Removal
1. Remove the engine cover. 2. Release fuel pressure. 3. Disconnect negative battery cable. 4. Drain cooling system. 5. Evacuate the A/C system using a suitable refrigerant recovery machi ...

Installation
Fig. 28: Sealing Boot Installation on Interconnecting Shaft - SEALING BOOT - RAISED BEAD IN THIS AREA OF SEALING BOOT - GROOVE - INTERCONNECTING SHAFT 1. Slide new sealing boot clamp (2 ...

0.042