Dodge Journey: MAINTENANCE SCHEDULES

EMISSIONS CONTROL SYSTEM MAINTENANCE
The Scheduled Maintenance services listed in bold type, must be done at the times or mileages specified to ensure the continued proper functioning of the Emissions Control System. These, and all ot ...

See also:

Removal
Fig. 93: Accessory Drive Belt System - 2.7L - GENERATOR - IDLER/TENSIONER 1. Perform fuel pressure release procedure before attempting any repairs. 2. Disconnect negative cable from rem ...

Standard procedure, Cleaning, Inspection
Standard procedure BATTERY RECONNECTION NOTE: This reconnection procedure is to be performed anytime the battery has been disconnected. 1. Connect the negative battery cable remote termin ...

Assembly
Fig. 65: Remove Input Shaft Bearing Cup NOTE: Always use ATF on all moving parts during this assembly procedure. 1. Use Bearing Cup Remover 9664 (2) and appropriate Slide Hammer (1) to r ...

0.0161